See what a project looks like inside Tideway.
This is a walkthrough of a sample marine permit project — a residential dock and boat lift — so you can see how Tideway organizes requirements, catches issues before submission, and tracks agency review. The project and data below are made up for illustration.
Sample project
Riverside Dock & Boat Lift — Stuart, FL
Private residential dock with a 10,000 lb boat lift · Martin County · St. Lucie River
Likely permits
State environmental resource permit, submerged-lands authorization, local dock permit
Agencies involved
Florida DEP · U.S. Army Corps of Engineers · Martin County
Project owner
Homeowner, working with a marine contractor
Submission readiness
Tideway checks a package for completeness and consistency before it goes to the agency, so avoidable problems get fixed first.
Submission readiness
82%
3 items to resolve before submission
Resolve before submitting
Likely agency corrections
TideAI recommendation
Resolve these three items before sending the package to reduce the chance of an avoidable correction round. Tideway does not guarantee any outcome or timeline — it helps you submit a cleaner package.
Permit requirements checklist
Tideway builds a requirements list for the project and tracks each item as it moves from outstanding to complete.
Documents
Everything for the project stored in one place.
Agency review tracking
Follow where the package is once it is submitted.
Martin County
Local dock permit
Florida DEP
Environmental resource permit
U.S. Army Corps of Engineers
Federal authorization
Review times are set by each agency. Tideway does not control agency decisions or timelines.
Ready to organize your own projects this way?
Then $99 per month. Credit card required. Cancel anytime.
The project shown on this page is a made-up example for illustration only. It does not represent a real permit, property, or outcome, and Tideway does not guarantee any permit approval or timeline.